Kupwara: The Executive Engineer PMGSY Kupwara today said the Dardsun- Reshigund road has been approved under PMGSY-111 Batch 1, package Number JK083002 at a cost of Rs. 463.32 lacs.
In a statement on Twitter, the Exe Engineer in a detailed hand out said that the work on the road will be commenced as soon as possible after all the formalities are done