LATEST UPDATES

 Use social media responsibly:  Cyber Police to netizens 

Precious Kashmir 11/12/2023

Chairman, All JKSCC calls on LG Sinha

Precious Kashmir 11/12/2023

Cold wave sweeps Kashmir, Sgr shivers at minus 4.4°C

Precious Kashmir 11/12/2023

3 men drowns to death in Reasi river

Precious Kashmir 11/12/2023

Police man shot at, injured in Bemina

Precious Kashmir 09/12/2023

14 NCC girl cadets embark on cyclothon from Kanyakumari to Kashmir

Indo Asian News Service 09/12/2023

Govt to make GIFT City global hub of new age finance & tech services: PM Modi

Indo Asian News Service 09/12/2023

At minus 4.6 degree Celsius, Sgr records coldest night of season

Precious Kashmir 09/12/2023

DSEJ announces winter vacation in phased manner from Dec-11

Precious Kashmir 08/12/2023

Air quality remains ‘very poor’, Delhi records min temp of 9.4

Indo Asian News Service 08/12/2023

Cold conditions tighten grip in Kashmir, Pahalgam coldest at minus 4.8 degree Celsius

Precious Kashmir 08/12/2023

4 feared dead after vehicle rolls down into gorge on Zojila Pass

Precious Kashmir 07/12/2023
  • Home
  • Front
  • Jammu & Kashmir
    • City
  • Anchor stories
  • Business
  • Sports
  • National
  • World
  • Opinion
    • Edit
    • Interviews
    • Letters
  • Epaper
  • Video
Monday, December 11, 2023
PRECIOUS KASHMIR
No Result
View All Result
  • Home
  • Front
  • Jammu & Kashmir
    • City
  • Anchor stories
  • Business
  • Sports
  • National
  • World
  • Opinion
    • Edit
    • Interviews
    • Letters
  • Epaper
  • Video
Precious Kashmir
No Result
View All Result
Home Front

Transmission line develops snag, additional power cuts in offing 

Precious Kashmir by Precious Kashmir
22/01/2022
in Front
1 min read
FacebookTwitterWhatsappEmail

By: Owais Gul

Srinagar: The people across Kashmir are set to witness additional power cuts in the next ten days as a transmission feeder line at Thanamandi developed technical snag on Friday.

Chief Engineer, Kashmir Power Distribution Corporation Limited (KPDCL), Aijaz Ahmad Dar said that due to some technical issues at 400 KV Jalandhar-Srinagar transmission feeder line, there is a possibility of further curtailment in the Valley.

He added that the department will try to ensure adequate electricity, but the fact is that “we are short by 50-100 MW. We are trying to load lines to the full capacity.”

“We are trying to give optimum loading to the lines and have a minimum effect of this outage,” he said, adding that there is a possibility of additional power cuts by half an hour to one hour.

Chief Engineer informed that the possibility of additional power cuts would continue till next ten days as the issues at Thanamandi transmission feeder line will be resolved in the same period.

“Although it takes a long period to rectify the issues at transmission feeder lines, but the agency has agreed to complete the repair work in next days,” he said and appealed the people to cooperate with the department till the situation improves. (KNO)

Share this:

  • Click to share on Twitter (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to print (Opens in new window)

Related

Share196Tweet123SendSend
Precious Kashmir

Precious Kashmir

ePAPER

Precious Kashmir

Copyright © 2020 Precious Kashmir.

Navigate Site

  • Home
  • About Us
  • Contact Us
  • Advertise with Us
  • Terms of Service

Follow Us

No Result
View All Result
  • Home
  • Front
  • Jammu & Kashmir
    • City
  • Anchor stories
  • Business
  • Sports
  • National
  • World
  • Opinion
    • Edit
    • Interviews
    • Letters
  • Epaper
  • Video

Copyright © 2020 Precious Kashmir.